The isometric below shows a water riser with an 8 WSFU branch at the first floor and another 8 WSFU branch at the second floor, both fed from a single main riser below the water meter. What is the total WSFU load the main riser must be sized to carry?
2ND FLOOR BRANCH (8 WSFU)
|
1ST FLOOR BRANCH (8 WSFU)
|
MAIN RISER
|
WATER METERNot quite. The answer is C: 16
Every branch above the main riser adds its full load onto that riser — the two 8 WSFU floor branches combine to a 16 WSFU total that the main riser itself has to carry below both connection points, not just the load of either floor considered on its own.
Reference: UPC 2021 §610.9; Table 610.3 (Fixture units accumulate on the piping that serves them)
Checked against the official text
Checked against the 2021 UPC text. Washington's exam is written against the 2015 edition, which we have not read for this section, so confirm it against your 2015 book.